Direct answer
Involve the integrator during schematic or design development, before reflected ceilings, millwork, lighting loads, shade pockets, mechanical systems, framing, and equipment spaces are fixed. Early coordination allows technology locations, pathways, backing, power, cooling, controls, and service access to be designed into the home rather than added after bids or rough-in.
The integrator should attend milestone reviews and issue coordinated device, rack, cable, and responsibility information before each relevant trade closes its scope. Waiting until low-voltage rough-in can force visible compromises, change orders, or inaccessible equipment. Camelback's industry-professional pages position this as a collaborative design and construction role.
Sources and technical references
Use the organizations responsible for a product, platform or standard to confirm current specifications and compatibility.
How this answer was prepared
Camelback Smart Homes publishes this FAQ library for homeowners, design professionals, builders and property teams comparing integrated technology. Answers begin with the practical conclusion, then explain the factors that can change it.
Limitations: This is general educational information, not a site-specific design, quote, code determination or compatibility guarantee. Final requirements depend on the property, construction, infrastructure, equipment versions and project goals.